Hi Ken
I beginning to think I had never started!
Its turning out to be one of those jobs where you start and three other jobs need doing at the same time.
The office was moved but the wifi was unreliable so I had to hard wire the router to the PC, up through the loft down the toilet wall (remove the downstairs toilet, run behind back of the utility cupboards etc)
The washing machine decided it was time to overflow the waste hose, so the drain rods had to come out
The upstairs toilet then decided to stop filling and the flush to run continuosly, so new fill and flush valve required, toilet is close coupled and concealed connections!
B&Q had originally schedulded delivery for 11th March for kitchen and 27th Feb for floor tiles.
Popped in today to change a door to pan drawers and they proudly annouced the kitchen is due for delivery this Thursday (13th) the day the plasterer comes, great we thought, until we double checked and its just the doors that are coming on the 13th, the carcasses are now coming 14th April!!!!
We have sold our old kitchen and stripped it all out this weekend as the buyer is collecting on the 15th Feb.
So no kitchen cupboards, sink, cooker, dishwasher or anything until the 14th April.
We are going to camp outside the B&Q entrance in the MH until they sort a better delivery date.
(Bet you wish you had never asked
)